We'll be finished this weekend, so I'll be posting the final photos soon. Ready to move-in next week. |
![]() |
Air conditioning installed and running. |
![]() |
Put the septic system in last Friday. Need to finish the front and back decks, then stain them. |
![]() |
The electrician finished the under cabinet lights today. |
![]() |
The stove and microwave oven are in. |
![]() |
All doors, knobs, and trim are installed. Interior painted. |
![]() |
Ceiling fans and blinds installed. |
![]() |
Carpet going in this week, will be done Saturday. Still need to install a hand rail , and then a dutch door at top of stairs to prevent young and old from falling down these 13 steps. |
![]() |
Basement living room is pretty good size. |
![]() |
Same living room from the opposite side. |
![]() |
Big basement quest bedroom. |
![]() |
This is our Harry Potter under stair play room and guest kid sleep room. |
![]() |
The 1,000 gallon septic tank and leach lines are complete. |
![]() |
Will have this stained and railing installed soon. |